Black Flag Contractors

New Build & Addition Shell Construction

Foundation and Block, from Layout to Lintel

Foundation and Block

Where Do I Start?

Send us your plan set. We run a full takeoff from the foundation plan, wall sections and structural sheets, then send you a line-item proposal within 24 hours. Contractors keep calling us back for the same reasons: the bid matches the plans, the crews show up, and the shell passes inspection the first time.

Is it a Good Fit for Me?

We're a fit if you're a general contractor, builder or owner-builder with a permitted or permit-ready set. That covers single-family new builds, block additions, elevated coastal homes and light commercial. If you want one licensed contractor to own everything from the footing to the truss strap, send the plans.

Send Plans for a Bid
What we offer

What's in a Black Flag Shell

Site Prep & Layout
Pad prep and compaction, survey stakes, erosion control, termite pre-treat coordination and footing layout.
Footings & Foundation
Monolithic or stem-wall foundations, pads, thickened edges and elevator pits, excavated, formed and reinforced to the engineer's schedule.
Slab on Grade
Vapor barrier, wire or fiber mesh per plan, 3,000 PSI pump mix placed and finished.
CMU Walls
8" block walls laid to plan with dowels, reinforced cells, lintels, knockout bond beams and columns, grouted per the structural notes.
Tie Beam & Straps
Bond beam steel, grout pour and truss straps set to layout, so the framer or truss crew can start the next day.
Inspections
Footing, slab, cell and tie-beam inspections scheduled and walked by us with the building department.

How it works

We take a unique approach to every project that comes our way. Here is a basic layout of how you can get started

1
Send Plans

Email or upload the PDF plan set.

2
Takeoff & Proposal

A line-item proposal within 24 hours, with assumptions and exclusions spelled out.

3
Schedule

We lock dates against your framing and truss delivery.

4
Build & Inspect

Foundation, block and tie beam built and inspected, with updates at every milestone.

Premium Service

From Layout to Lintel

Having one licensed contractor run your foundation and shell means one number to call and one party accountable. We build the structure the rest of the house depends on, and we hand it back plumb, square and inspected.

Why Builders Pick Us for Shells

• Proposals in 24 hours, broken out by phase so you can compare them line for line.

• Specified products priced as specified. We tell you when the plans call out a proprietary system.

• Coastal and flood-zone experience: stem walls, flood vents, elevator shafts, CMU below the design flood elevation.

• Customer portal for schedules, documents and invoices

Testimonial

Client Feedback & Reviews

FAQ

Most Popular Questions

Everything from rough-graded lot to top of masonry: site prep, footings, slab, CMU walls, reinforcement, lintels, grout, tie beam and truss straps.

Both. The engineer's details decide, and our proposal states which one we priced.

We price the specified product and flag it. If a vendor quote is required, we tell you before the bid is final.

The permit is typically under the GC. We coordinate and walk every structural inspection in our scope.

It depends on size and inspections. A typical single-story residential shell runs a few weeks from footing dig to tie-beam pour.

Only if you want it. We can finish the shell in lath and stucco, or stop at the block.

Scroll to Top